I. Regularly Clean Tube Bundle Scale
1. Impact of Scale: Scale buildup in tube bundles reduces heat transfer efficiency, leading to increased energy consumption and even overheating.
2. Cleaning Methods:
During operation: Flush scale from the tube walls by increasing flow rate or operating in reverse, or inject chemical solvents to dissolve the scale.
During shutdown: Thoroughly inspect the inside and outside of the tubes for scale buildup, and use a pipe cleaner or mechanical tools to remove blockages.
II. Check the Lubrication System
1. Importance of Lubrication: Poor lubrication is the main cause of 36% of equipment failures; friction and wear must be reduced.
2. Operating Procedures: Add lubricant according to the "five fixed" principles (fixed personnel, fixed location, fixed quality, fixed quantity, and fixed time).
Regularly check oil level and quality, and avoid using non-specialized lubricants.
III. Standardized Operating Procedures
1. Pre-operation Check: Confirm that the power, water, and air sources are connected normally and that the pressure values meet the standards. 2. In-operation monitoring: Observe whether the temperature and pressure are stable, and promptly address any abnormal noise or leaks.
3. Post-operation maintenance: Clean the filter, empty the water tank, and keep the equipment dry.
IV. Other key measures
1. Sealing system maintenance: Regularly check the wear of the seals to prevent leaks from affecting efficiency.
2. Inspection system: Develop a "five-fixed" inspection plan (fixed location, fixed method, fixed standard, fixed time, fixed person).





