I. Pre-disassembly Preparation
1. System Isolation
Close the feed valve, drain any remaining media from the pipes, and reduce the pressure to 0 MPa to ensure complete isolation of the equipment from the system.
Disconnect the power supply and hang a warning sign to prevent accidental startup.
2. Tool Preparation
Prepare a ring wrench, calipers, a soft-bristled brush, a special cleaning agent (such as 1-2% hydrochloric acid solution), and protective gear.
II. Disassembly Steps
1. Removing Connecting Components
Use calipers to loosen the special clamps connecting the cyclone to the pipes and remove the feed pipe and underflow/overflow pipes.
Mark the position of each component (such as the flange bolt numbers) to avoid incorrect reassembly.
2. Disassembling the Cyclone Assembly
Disassemble the cyclone housing and remove the core components, including the cyclone tube, grit nozzle, and center tube.
Check the integrity of seals (such as O-rings and graphite rings). Replace any severely worn seals. III. Cleaning and Inspection
1. Physical Cleaning
Use a soft-bristled brush to remove scale from the inner wall of the cyclone tube. Stubborn deposits can be soaked in a hydrochloric acid solution (1-2%) for 4 hours.
Perform high-pressure water flushing (pressure ≤ 0.5 MPa) or ultrasonic cleaning (for heavily polluted conditions).
2. Inspection of Key Components
Measure the diameter of the grit nozzle. If enlarged by more than 10%, replace it.
Inspect the inner wall of the cyclone chamber for wear. Scratches > 0.5 mm require repair or replacement.
IV. Reassembly and Testing
1. Assembly Sequence
Assemble in the reverse order of disassembly, ensuring the sealing surfaces are clean and free of impurities, and that the clamps are tightened symmetrically.
Apply anti-seize compound to prevent bolts from sticking (for high-temperature conditions).
2. Trial Run Verification
After filling and venting the pump, start the pump unit and observe the pressure (0.3-0.8 MPa) and discharge status for normal operation.
Precautions
Safety precautions: Wear goggles during disassembly to avoid injury from spring ejection. Anti-corrosion: After cleaning, rinse with deionized water to prevent residual hydrochloric acid from corroding the metal.