First drain the condensed water in the steam line, then close the shut-off valve. Then turn on the air switch of the electric control cabinet (the corresponding red light is on), and start the circulating fan of each heating chamber. Then, when the temperature in the drying room reaches 145°C, set the switch of the speed regulating motor controller to the "on" position, and then turn the speed regulating knob clockwise to make the pointer to the desired position. At the same time, adjust the tightness of the conveyor chain, and then start feeding the dryer. Special: Pay attention to the uniformity of the blanking at the feeding end. Then open the stop valve for steam supply to heat the drying chamber. When the steam working pressure is 0.4~1.0Mpa, the excellent performance of the machine can be fully exerted.
Finally, by adjusting the angle of the air inlet and exhaust air valves, the humidity in the drying room is controlled to achieve the best drying state of the material.